Things are moving quickly around the Grace Church construction site. If you show up on Sunday you will notice that the construction fence is GONE! The building is completely lockable with all the exterior doors in place so we do not need the fence any longer.
Also, the portals and columns are painted to match the existing structure. The windows are also completely in and the roof is over 50% finished. The electricians are busy finishing up throughout the interior of the building as well.
The building does not sound so hollow because of all the insulation that has been put up and continues to be put up. There is also a layer of insulation on the outside of the building that goes under the stucco. As soon as all the insulation is installed the stucco will be slathered on.
There are many other things that are slated to happen any day now. Soon, Santa Monica (the road to the north of the church) will be widened and the new north parking lot entrance will be done. Shortly after the road is done the parking lot will be finished. There is also more concrete to be poured and light poles to be installed, so watch for them.
Here are some pictures for your viewing pleasure. [if you are viewing this in facebook and cannot see the pictures, please click “View Original Post” below this post.
http://picasaweb.google.com/Aaron.Giesler/61709?authkey=Gv1sRgCK353JWE09GXxQE&feat=directlink